A7HGP/A6GPP-CPU connection.
Length: 30m. 4 channels.
4 wire type.
Platinum resistance (Pt100, JPt100).
Conversion rate: 40ms/1 channel.
47 point terminal station A1SCPU-S1 PDF.
Input status and input information input from the input interface,
CPU will be stored in the working data memory or in the input image register.
And then combine the data and the program with CPU.
The result is stored in the output image register or the working data memory,
And then output to the output interface, control the external drive
A1SCPU-S1
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive A1SCPU-S1 PDF.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC A1SCPU-S1 PDF.
The working process of the input interface circuit: when the switch is closed, the diode light,
The transistor is then guided to the internal circuit and input signal under the irradiation of the light MITSUBISHI Programming Manual.
When the switch is off, the diode does not emit light, and the transistor is not on the way. Internal circuit input signal.
It is through the input interface circuit to the external switch signal into PLC internal can accept the digital signal.
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian MITSUBISHI Programming Manual.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user orienteed instruction,
And through digital or analog input / output control of various types of machinery or production process MITSUBISHI Programming Manual A1SCPU-S1 Manual . Screw terminal table type.
High precision / high resolution / high speed 2 piece type terminal.
Voltage / current output module.
Number of channels: 2 channels.
Number of stations: 1 stops.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on--line unification to adjust A1SCPU-S1 Programming Manual.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on stepp by step A1SCPU-S1 Manual .
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.