Enter points: 64 points.
Voltage: DC12/24V.
Current: 3/7mA.
Response time: 10ms.
32 points / a common end.
Cathode common.
40 pin connector.
High speed input A1SJCPU-S3 PDF.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear
A1SJCPU-S3
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive A1SJCPU-S3 PDF.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC A1SJCPU-S3 PDF.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Innput refresh process A1SJCPU-S3 Manual . When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read MITSUBISHI Programming Manual.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three MITSUBISHI Programming Manual.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay. Output type: transistor output, drain type MITSUBISHI Programming Manual.
Output points: 8 points.
OFF leakage current: 0.1mA.
Output protection function.
Rated load voltage / current: DC24V/DC24V/0.1A.
External connection: 2 wire.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction.
MITSUBISHI PLC program siimulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program A1SJCPU-S3 Manual A1SJCPU-S3 Programming Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.