FL-net (OPCN-2) Ver.1.00 interface.
10BASE5 use.Battery replacement.
Initial voltage 3.0V.
Service life: 5 years.Input: 4 channels.
Thermocouple (K, J, T, B, S, E, R, N, U, L, PLlI, W5Re/W26Re,,) Q25HCPU PDF.
Heater disconnection detection function.
Sampling period: 0.5s/4 channel.
18 point terminal table x2.
Peak current suppression.
Can prevent the simultaneous opening of the output to control the peak current, which is helpful for saving energy and reducing the operation cost
Q25HCPU
Heating function at the same time.
The multiple loop can reach the set value at the same time to carry out the uniform temperature control,
Helps to prevent no-load and effective energy saving and reduce operating costs Q25HCPU PDF.
Automatic adjustment function.
The PID constant can be adjusted automatically in the control process Q25HCPU Manual .
Automatic adjustment of cost (time, material and electrical energy) can be reduced.
Can be flexible in various settings, to achieve the best temperature control of the temperature control module Q25HCPU PDF.
Equipment for high temperature control stability of extrusion molding machine,
The temperature regulating module has the function of preventing overheating and preventing over cooling.
According to the control object device, select the standard control (heating or cooling) or the heating and cooling control (heating and cooling) mode MITSUBISHI Programming Manual.
In addition, the mixed control mode (combined with the standard control and heating - cooling control) can be selected. Input and output points: 1024 points.
Input / output data points: 8192 points MITSUBISHI Programming Manual.
Program capacity: 60k.
Basic command processing speed (LD command) S:0.075.
PLC in the program execution stage: according to the order of the user program order to store the order of each instruction,
After the corresponding operation and processing, the result is written to the output status register,
The contents of the output status register are changed with the execution of the program MITSUBISHI Programming Manual Q25HCPU Programming Manual.
Output refresh phase: when all instructions are executed,
The output status register is sent to the ooutput latch in the output refresh stage,
And through a certain way (relay, transistor or transistor) output, drive the corresponding output equipment Q25HCPU Manual .