Enter 8 points.
7mA DC24V.
Response time: 12ms.
8 positive, 1 public to reduce the public in common use.
Output 8 points.
DC24V/AC240V, 2A/1 point, 8A/1 common.
Response time: 12ms.
8 point 1 public 20 point terminal.
PLC is introduced by the relay control technology after the development of micro processing technology,
Can be easily and reliably used for switching control AJ65SBTB2-8T1 PDF.
As the analog quantity can be converted into digital quantity, the number of digital quantity is just a number of switching value,
Therefore, after the conversion of analog, PLC can also be reliable for processing control
AJ65SBTB2-8T1
Because the continuous production process often has the analog quantity, the analog quantity control is sometimes called process control AJ65SBTB2-8T1 PDF.
Analog quantity is not electricity, and PLC can only handle digital quantity, quantity of electricity.
All to realize the conversion between them to have the sensor, the analog quantity into a number of power.
If this power is not standard, but also through the transmitter,
The non-standard power into a standard electrical signal, such as 1-5V, 4-20mA, 0-10V, etc AJ65SBTB2-8T1 PDF. .
At the same time, there is also an analog input unit (A/D),
Transform these standard electrical signals into digital signals,
The analog output unit (D/A), in order to transform the digital quantity after PLC processing into analog quantity -- standard electric signal.
So the standard telecommunication number, the conversion between the number of operations to use a variety of computing.
This requires the resolution of the analog unit and the standard electrical signal. Ethernet network module 10BASE-T / 10BASE5.Using A1SJ71LP21 and A1SJ71BR11MELSECNET/10 modules,
Can be any ANSCPU module to the network system.
Two options can be provided; the optical cable token ring network and the coaxial cable token bus network.
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on.
This phenomenon is called the I/O delay time effect.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order AJ65SBTB2-8T1 datasheet.
So, sometimes also known as the order control.
And seqquential control is divided into manual, semi-automatic or automatic AJ65SBTB2-8T1 datasheet.
And the control principle is decentralized, centralized and hybrid control three.