8 slots.
To install the power supply.
For QnA/A series.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order AJ71E71-S3 PDF.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic
AJ71E71-S3
And the control principle is decentralized, centralized and hybrid control three.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read AJ71E71-S3 PDF.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions AJ71E71-S3 PDF.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear. Large capacity battery.Long distance bus connection for QnA/ACPU.
Applicable models: GT16, GT15, GT11. A1SI61 is designed to control the application of mechanical devices that require high speed response time.
A1SI61 temporarily stop running in order to generate an interrupt signal when the program is running,
And according to the interrupt vector to execute the corresponding interrupt handler.
The interrupt start condition can be selected according to the type of the connected device,
That is, the rising edge of the interrupt signal can be selected as a starting signal, and the falling edge of the interrupt signal can be selected as an interrupt.
The popularization and application of PLC programming has been developed rapidly in our country,
It has been widely used in all kinds of mechanical equipment and production process of electrical control devices,
All walks of life have emerged a large number of application of PLC transformation of the results of the equipment.
Understand the working principle of PLC, have the ability to design, debug and maintain the PLC control system,
Has become the basic requirements of modern industry for electrical technicians and engineering students.
The instruction list programming language is a programming language similar to assembly language mnemonic,
As well as assembly language by the operation code and the number of operations.
In the case of the computer for the PLC handheld programmer compile user program.
At the same time, the programming language of the instruction list corresponds to the ladder diagram programming language,
In PLC programming software can be converted to each other. Figure 3 is the instruction sheet corresponding to the ladder diagram of figure 2PLC.
The characteristics of instruction table programming languagge is used to represent mnemonic operation function,
Easy to remember, easy to grasp;
In the handheld programmer on the keyboard using the mnemonic representation, easy to operate, can be programmed in computer;
There is a one-tto-one correspondence between the ladder diagram and the ladder diagram AJ71E71-S3 datasheet AJ71E71-S3 datasheet. Its characteristics are basically consistent with the ladder diagram language.