Video display function: NTSC / PAL input system, 4CH.
RGB display function: analog RGB input system, 1CH.
Applicable model: A985GOT-V. Output points: 8 points.
Output voltage and current: DC24V/AC240V, 2A/1 point, 8A/1 common end.
Output response time: 12ms.
8 point /1 a public side.
Output form: relay output .
24 point terminal station.
MITSUBISHI PLC protection and chain procedures GT10-C100R4-8PC.
Protection and chain is an indispensable part of the program, must be carefully considered
GT10-C100R4-8PC
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system GT10-C100R4-8PC.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program GT10-C100R4-8PC.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. MITSUBISHI inverter FR-D740 series.
Voltage level: three phase 400V.
Frequency converter capacity: 7.5KW.
The internal and back of the inverter structure considering the cooling effect, the relationship between the upper and lower ventilation is also important,
Therefore, in order for the type of unit, hanging on the wall to the vertical position, the installation of vertical as possible.
Transducer can be used to drive a single phase mmotor? Can single phaase power supply be used?
Basically can not be used GT10-C100R4-8PC. For a single phase motor with governor switch, the auxiliary winding will be burnt when the speed is below the operating point;
For the capacitor start or capacitor operation mode, the capacitor exxplosion will be induced GT10-C100R4-8PC.
The inverter power supply is usually 3, but the capacity for small, single-phase power is also useful functioning aircraft.
GT10-C100R4-8PC Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=GT10-C100R4-8PC&select=5