MR-PWCNS1 power connector set for
HC-SFS81.
HC-SFS52; 102; 152; 524; 1024; 1524.
HC-SFS53; 103; 153.
HC-LFS52; 102; 152.
HC-RFS103; 153; 203.
HC-UFS72; 152.
For MR-J2S-11KA (4) MR-J2S-22KA to (4). MITSUBISHI inverter FR-F720 series.
Voltage level: three phase 200V.
Frequency converter capacity: 22KW .
When the inverter is running, the starting current and starting torque of the motor are how?
With the operation of the inverter, with the acceleration of the motor to improve the frequency and voltage,
The starting current is limited to 150% below the rated current (according to the different types of aircraft, 125%~200%)
HC-UP352B
Starting with power frequency power supply, the starting current is 6~7 times of the rated current, therefore, the impact on the mechanical and electrical HC-UP352B.
The inverter drive can be smoothly start (start time longer).
The starting current is 1.2~1.5 times of the rated current, and the starting torque is 70%~120% rated torque;
For the inverter with the torque automatic enhancement function, the starting torque is more than 100%, which can start with full load HC-UP352B. 8 slots .
No need to install power.
For QnA/A series.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption off centralized sampling HC-UP352B.
Cenntralized output mode .
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program tto do the compiler to compile the process of interpretation HC-UP352B.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
HC-UP352B Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=HC-UP352B&select=5