A series of high performance models that are widely used in network or single machine work environments.
Screen size: 10.4 inches.
Display color: 256 color or more color.
Installation type: compatible with video /RGB.
Resolution: SVGA (800 x 600).
Display device: TFT color (high brightness, wide viewing angle) .
Host frame color: black.
Power type: DC24V A950GOT-SBD.
Communication interface: with built-in RS-422
A950GOT-SBD
Ideal model for high performance in a network or independent operation environment.
User storage capacity: 9MB (GT15__-VNB_:5MB).
Device USB port.
Standard RS-232 interface.
Support video /RGB unit.
If the capacitive touch screen is in the middle of the operation, the display resolution or display mode of the touch screen is changed again,
Or the refresh rate of the touch screen controller is adjusted by itself, and the cursor and the touch point can not be felt when the cursor is not corresponding to the touch point,
Must be re calibrated to the touch screen system A950GOT-SBD.
In order to ensure the normal operation of the touch screen system, in addition to ensure the proper installation of the system software,
Must also remember that in a host do not install two or more than two kinds of touch screen driver,
This will cause the system to run in conflict, so that the touch screen system can not be used properly A950GOT-SBD. Analog channel: 4 channels.
Input / output (resolution): 0 ~ 4000.
Conversion speed: 100ms/4 channel.
Analog module installation.
Power supply: AC85V ~ 132V.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end oof the PLC system in a haard wired way, and the timeliness is strong A950GOT-SBD.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too gguarantee the timeliness A950GOT-SBD.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.
A950GOT-SBD Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=A950GOT-SBD&select=5