Extension cable.
Length: 2000mm. Pulse input: DC input.
Default input: DC input.
Count range: 0~16777215.
Number of stations: 4 stops.
Station type: remote equipment station.
Configuration of master / local station,
In addition to the other site network with different CC-Link in addition to the main station and the remote station configuration can also be the main station and the local station configuration
FX-16E-500CAB
A local PLC can communicate with the master station PLC and other remote workstations. Motor series: medium inertia, medium capacity.
Using a serial absolute / incremental encoder.
Rated output power: 0.5kw.
Rated speed: 2000rpm.
With a brake band FX-16E-500CAB.
Shaft end: straight shaft.
The rotor of AC servo motor is usually made of squirrel cage, but in order to make the servo motor has a wide range of speed regulation, linear mechanical properties,
Without the "rotation" phenomenon and the performance of the fast response, it is compared with the ordinary motor,
The two characteristics of rotor resistance and moment of inertia should be provided FX-16E-500CAB.
At present, there are two kinds of rotor structure, one is the squirrel cage rotor, which is made of conductive material with high resistivity,
In order to reduce the moment of inertia of the rotor, the rotor is slender . Analog channel: 4 channels.
Input / output (resolution): 0 ~ 4000.
Conversion speed: 100ms/4 channel.
Analog module installation.
Power supply: AC170V ~ 264V.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a haard wired way, and the timeliness is strong FX-16E-500CAB.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too gguarantee the timeliness FX-16E-500CAB.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.
FX-16E-500CAB Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=FX-16E-500CAB&select=5