Cable length: 3m.
The connection between the CC-LINK interface unit and the smart GOT.
Applicable model: HandyGOT. Input type: DC input, positive public end / negative public end.
Input points: 4 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/4mA.
Output form: relay output .
Output points: 4 points GT15V-75R1.
OFF leakage current: -.
Output protection function: No
GT15V-75R1
Rated load voltage / current: DC30V/AC250V/2A.
External connection: 2 line /2 line type.
Screw terminal table type.
Minimum size of industry.
The connection object at a glance with terminal cover plate.
Input module for public end of positive pole and negative pole GT15V-75R1.
Terminal table structure capable of connecting with 2 wire type sensor and load in the same condition .
Can be installed along the 6 direction. Input points: 32 points.
Voltage: DC24V.
Current: 8.5mA.
Response time: 10ms.
32 points / a common end.
Positive / negative sharing.
38 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation GT15V-75R1.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, tthe output refresh GT15V-75R1.
The coontents of the component image register are changed with the change of the execution of the program .
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to thhe adoption of centralized sampling GT15V-75R1.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
GT15V-75R1 Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=GT15V-75R1&select=5