MITSUBISHI inverter FR-L740 series.
Voltage level: three phase 400V.
Frequency converter capacity: 37KW.
Integration of the three works the core technology, the outstanding performance of reeling, release the high cost of bright light.
Wide range of professional use and advanced control.
Professional built-in function to ensure the constant material tension, suitable for the application of printing and packaging industry
GT15V-75ROUT
Fusion application of the tension products of MITSUBISHI by inverter.
Suitable for tension control of high precision cable and material processing occasions.
Professional function to ensure the safe operation of textile machinery equipment,
The spinning quality and production efficiency are improved GT15V-75ROUT. The application of textile machinery and equipment. Cable length: 2m.
For MR-J2S-700A (4) /CP/CL or less.
Encoder for HC-SFS; HC-LFS; HC-RFS; 2000r/min HA-LFS; HC-UFS servo motor.
-H products have a long flex life.
Coding is not resistant to oil. MELSECNET/MINI (-S3) data link system, A2C system transfer converter.
Plastic fiber cable -GI optical fiber cable GT15V-75ROUT.
MITSUBISHI PLC protection and chain procedures .
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial statee display, etc GT15V-75ROUT..
MITSUBIISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee prrogram GT15V-75ROUT.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
GT15V-75ROUT Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=GT15V-75ROUT&select=5