Specifications: according to the connection source.
Corresponding models: FX3GA, FX3G, FX3GE, FX3GC, FX3U, FX3UC. MITSUBISHI inverter FR-A720 series.
Voltage level: 3 phase 200V.
Frequency converter capacity: 30KW.
Inverter general area of domestic enterprises to occupy more than 80% of the market share,
Production of frequency converter, motor soft starter and other industrial automation control of the manufacturers, the use of heavy-duty design products,
Overload capacity, with super large start and running capacity, improve the automatic detection, protection and control performance,
Can start and control any type of heavy duty motor,
Products have been widely used in metallurgy, mining, paper, chemicals, building materials, machinery, electricity, and construction systems and other industrial transmission areas
HC-SFS152G2 1/20 Connecting cable for handheld GOT and PLC.
Cable length: 10 meters.
Application: RS-422 connection and RS-232C connection. Input voltage: AC100-240V.
Rated output: DC5V, 5A.
The power supply module is connected with the external power supply,
AnS programmable controller to provide the required DC5V,
They are inserted in the slot of the special power supply component on the base board,
The output of the DC5V is powered by the power supply on the substrate to the component HC-SFS152G2 1/20.
The input voltage of the component is related to the selected model.
A1S61PN/62PN has Deng generation A1S61P/A1S62P, A1S61PEU/A1S62PEU. DC input points: 16 points.
Input voltage and current: 7mA, DC24V.
Response time: 10ms.
16 point /1 a public side.
Positive / negative sharing.
40 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state dissplay, etc HC-SFS152G2 1/20..
MITSUBIISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee prrogram HC-SFS152G2 1/20.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
HC-SFS152G2 1/20 Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=HC-SFS152G2 1/20&select=5