The length of the line: 2M.
IP level: IP65.
Relay type.
Bending life: high bending life.
Electric motor power supply cable (motor side), for HF-KP/HF-MP series (motor shaft with side extraction). Oil resistant cap for 12.1 inch screen.
Applicable model: GT16. MITSUBISHI inverter series: FR-A820.
Voltage level: three phase 200V .
Power: 22kw LJ71C24-R2-CM.
SLD converter rated current: 125A.
Structure and function: Standard model
LJ71C24-R2-CM
Type: CA.
Substrate coating: have.
Parameters can be selected by 4 different rated current and different overload rating (SLD (ultra light load) rated, LD (light load) rating, ND (general load) rating, HD (weight).
Type load) for selection LJ71C24-R2-CM.
You can choose the most suitable frequency converter for use; and by selecting a transducer with a SLD or LD rated level,
Be able to reduce the size of the device (compared with the FR-A700 series, to reduce the volume of equipment) .
For applications that require high torque at low speeds, the HD rating is the most suitable.
The controller is used to control and monitor the frequency converter through the network LJ71C24-R2-CM.
Standard corresponding RS-485 communication (MITSUBISHI converter protocol, Modbus-RTU protocol) data transmission speed up to 115200bps . Input points: 32 points.
Voltage: DC12V/DC24V/AC12V/AC24V.
Current: 4mA (DC12V/AC12V) /8.5mA (DC24V/AC24V).
Response time: 25ms.
32 points / a common end.
38 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh LJ71C24-R2-CM.
The coontents of the component image register are changed with the change of the execution of the program .
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to thhe adoption of centralized sampling LJ71C24-R2-CM.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
LJ71C24-R2-CM Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=LJ71C24-R2-CM&select=5