Function expansion board for RS-422 communication.Drive: MR-H_ACN series built-in positioning function.
Rated output: 1.0KW.
In servo drive speed closed loop,
Rotor speed measurement accuracy is very important to improve the dynamic and static characteristics of the speed control loop.
In order to seek the balance between measurement precision and system cost, incremental photoelectric encoder is generally used as the speed measuring sensor,
The corresponding method is M/T velocity measurement
QJ71CMON
Although the M/T measurement method has a certain measurement accuracy and a wide range of measurement,
But this method has its inherent defects,
Mainly includes: the measurement period must be detected at least one complete encoder pulse, limiting the minimum detectable speed QJ71CMON.
2 control system for speed control of the timer switch is difficult to maintain synchronization,
Can not guarantee the accuracy of measurement in the situation where the speed change is larger.
Therefore, it is difficult to improve the speed tracking and control performance of servo drive by using the traditional speed loop design method QJ71CMON. Drive unit.
MITSUBISHI universal AC servo amplifier MELSERVO-J4 series.
Rated output: 45kw.
Interface: universal type.
Power supply: three phase AC400V.
Special specifications: full closed control 4 wire / support mechanical end encoder ABZ phase input / support positioning mode.
Support position control, speed control, torque control.
Position control to follow the position instructions.
When the control is inserted, the position control is performed.
Speed control follows the speed command to control the speed within a certain range.
Torque control to follow the torque command to control the stable torque.
Function of switching amplitude. The increase in the process of switching and stopping,
And in the operation of the use of the switching signal, switching growth. Protective film for 8.4 inch screen.
Scrub, 5.
Applicable model: GT16. DC input points: 8 points.
Input voltage and current: 7mA, DC24V.
Response time: 10ms.
8 point /1 a public side.
Positive / negative sharing.
24 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial sstate display, etc QJ71CMON..
MITSUBIISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee prrogram QJ71CMON.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
QJ71CMON Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=QJ71CMON&select=5