Input type: DC input, positive common end.
Input points: 8 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
Output form: transistor output, leakage type.
Output points: 8 points.
OFF leakage current: 0.1mA.
Output protection function: No.
Rated load voltage / current: DC24V/0 . 5A.
External connection: 4 wire Q81BD-J71GF11-T2.
Fast connector type.
Simple wiring through quick connector
Q81BD-J71GF11-T2
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program Q81BD-J71GF11-T2.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. Hardware implementation is mainly to control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram Q81BD-J71GF11-T2.
Electrical interconnection diagram of each part of the design system .
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced. Cable length: 20m.
For MR-J2S-700A (4) /CP/CL or less.
Encoder for HC-SFS; HC-LFS; HC-RFS; 2000r/min HA-LFS; HC-UFS servo motor.
-H products have a long flex life.
"The most common station 11 units connected network: 121.
The 11 largest network connection units security station: 32.
Maximum network number: 239 sets.
Maximum secure connection of 1 units: 31 connection.
Security PLC (secure programmable system) refers to the self or external components or the implementation of the failure of the agency,
Can still respond to and promptly cut off the output of the programmable system.
Different from ordinary PLC, security PLC not only can provide the function of ordinary PLC,
Safe control function can be realized,
Meet the requirements of the ISO 13849-1 EN and IEC 61508 control system safety related component standards.
PLC security market mainstream has oilz (Pilz) PSS 3000, PSS 4000,
PSS 4000 in addition to the security pprocess can also be processed outside the standard control procedures Q81BD-J71GF11-T2.
All the components in the security PLC adopt the redundancy structure,
Two processor processing for cross detection,
The processing results of each processor are stored in their respective memory,,
OOutput is only when the processing result is in full agreement,
If any inconsistency occurs during the process, the system is immediately shut down Q81BD-J71GF11-T2. "