Input: 2 channels.
50kpps.
Counter input signal: DC5/12/24V.
External input: DC5/12/24V.
Uniform output: Transistor (drain type).
Used to replace the A series of large modules "AD61" Q12HCPU PDF.
40 pin connector.
Support high resolution devices. Pulse input and high speed counter module product group satisfying high speed and high precision control application.
High speed counter module for counting high-speed pulse train
Q12HCPU
Can be used in combination with the external encoder for positioning and other control.
The maximum count rate can be switched, and the low frequency pulse is counted from the high speed pulse to the rising edge / falling edge Q12HCPU PDF.
Each 1 channel is equipped with 2 points of external uniform output.
Can be selected according to the use of "consistent output function", "continuous comparison function", to achieve high-speed control of external equipment. (QD64D2)
Provides a variety of functions, such as the same output test function (using a continuous comparison function), the default function, the latch counter function,
In order to meet the needs of various applications Q12HCPPU PDF Q12HCPU Manual . (QD64D2)
The maximum count rate of the input pulse can be up to 8Mpps (differential input, 2 phase, 4 double frequency) MITSUBISHI Programming Manual.
Can be in the semiconductor, liquid crystal manufacturing and other high position accuracy requirements of the equipment,
Perform accurate position tracking using high resolution encoders. (QD65PD2)Measurement items: leakage current (Io), resistive leakage current (Ior).
Measuring circuit number: 2 circuits MITSUBISHI Programming Manual.
Insulation monitoring module for measuring leakage current.
Leakage current can be measured to ensure safety by monitoring the leakage current (Io), can detect the risk of electric shock.
Insulation state measurement of resistive leakage current (Ior) can be monitored continuously and continuously,
In order to continuously monitor the insulation aging status of the equipment MITSUBISHI Programming Manual.
Each measurement project can be carried out in the 2 phase of the alarm monitoring can be respectively on the leakage current (Io), resistive leakage current (Ior) for the 2 phase of the alarm monitoring,
Noo ladder diagram program Q12HCPU Programming Manual. Alarm monitoring is divided into 2 stages of attention alarm and danger alarm.
A module can measure two circuits of a module can be two circuits on the same line in the same system type power measurement.
Inn addition, Works2 GX (1 Q12HCPU Manual . 90U version or higher version) can be used to easily set the parameters.
Leakage current (Io), resistive leakage current (Ior).